[Reference: This office Circular No C-164, dated: 30.05.2017, C-168, dated: 10.01.2017, C-169, dated: 17.07.2017 and C-177, dated: 19.12.2017]
(a) As per Circular under reference LPC-cum-datasheet (Hard-copies generated through Utility) duly verified by LAO/ CDA/ PAO has to be forwarded by Head of the Offices alongwith softcopy i.e. M S Access Utility (available in this website) in Compact Disk.
MS Access Utility-Offline (available in www.pcdapension.nic.in)
However, LPC-cum-datasheets are being received without MS Access Utility in Compact Disk. In several cases instead of Utility, handwritten or scanned image/pdf of LPC-cum-datasheet, or LPC-cum-datasheets prepared manually through MS Word of MS Excel is being received. In absence of Utility, this office is unable to capture details in our system and ultimately has no option but to
return LPC cum datasheets.
(b) LPC-cum-datasheets are received without obtaining HOO-ID, which is compulsory requirement of processing of cases through software. As e-PPO is to be transmitted electronically to H.0.0. e-mail id.
(c) Hard copies of LPC-cum-data sheets are being received without vetting of Pay Details from CDA / LAO / PAO.
(d) Capacity of Utility is more than 1000 number of records. However, Utility containing single record for each pensioner is being received, which makes uploading difficult. (e.g. one CD contain record of one pensioner and for 20-cases, 20-CDs are sent)
(e) LPC cum datasheet are being received in staggered manner instead of in convenient batches alongwith Top-sheet under a covering memo.
(f) Field/ structure of MS Access utility are being modified by some units at their own level resulting rejections at the time of uploading of data in system.
(g) Number of records in MS Access Utility not in consonance hard copies of LPC-cum-datasheets received in a particular batch resulting return of claims. Hard copies of LPC-cum-datasheet are also not serially numbered. For example:
Utility contains 100 records whereas LPC-cum-datasheets received is 15 only that
too are not serially numbered.
(h) Retiring pay scale (respective column with reference to pay commission wherein date of retirement of pensioner fall) and pay in ”Pay Detail” column of LPC-cum-datasheet are being left blank.
(i) In-correct/in-complete Pension Disbursing Authority details are being filled-in ”PDA Details column” of LPC-cum-datasheet. For example- Old 4-5 digit Bank A / c number are being mentioned instead of latest Bank A/c Number.
(j) LPC-cum-datasheet in respect of pensioners, who are drawing Compulsory retirement pensions, Compassionate allowance pension, Post-2016 retiree and are not eligible for revision (For example: cases where only gratuity has been sanctioned, cases where family pensioner was entitled for family pension only prior to 01.01.2016 etc.) under above orders are being received from Head of the offices.
(k) Organisation code, HOD-ID, PPO number etc. are not filled-in correctly resulting in return / rejection of claims.
(1) Same record is being forwarded in Utility with each batch of LPC-cum-datasheets. In other words duplicate records are sent for revision.
(m) CD containing Utility are not being properly attached with LPC-cum-datasheets in secure manner resulting damage to or lost in transit of Compact Disk.
(n) Compact disks are found BLANK or un-readable.
Source: http://pcdapension.nic.in/pcdapension/Misc/do.pdf
Popular
Label List
- -BONUS ORDER
- 'BONUS
- AICPIN
- AIDEF
- AIR INDIA
- AIRF
- AITUC
- ALLOWANCE
- annual increment
- ARMY
- BANK EMPLOYEES
- BSNL
- cadre restructuring
- cadre review
- CBSE
- cgda
- CGHS
- CHILD CARE LEAVE
- children education allowance
- CONFEDERATION
- DA
- DC JCM
- DEARNESS ALLOWANCE
- dearness relief
- DOPT
- EMPLOYEES PROVIDENT FUND
- EPFO
- FAMILY PENSION
- finmin
- FIXED MEDICAL ALLOWANCE
- GDS
- GENERAL PROVIDENT FUND
- GPF
- GRADE PAY
- HOLIDAY
- HOLIDAY HOMES
- HOUSE BUILDING ADVANCE
- HOUSE RENT ALLOWANCE
- HRA
- INCOMETAX
- JCM
- JCM III
- KENDRIYA VIDYALAYA
- LEAVE TRAVEL CONCESSION
- LTC
- LTC 80 FARE
- LTC ADVANCE
- MACP
- MATERNITY LEAVE
- MAY DAY
- MINISTRY OF DEFENCE
- MINISTRY OF FINANCE
- MODIFIED ASSURED CAREER PROGRESSION
- NATIONAL ANOMALY COMMITTEE
- NATIONAL PENSION SCHEME
- NATIONAL PENSION SYSTEM
- NC JCM
- NEW PENSION SCHEME
- NIGHT DUTY ALLOWANCE
- NJCA
- OFB
- one rank one pension
- ONE RANK ONE PENSION.
- ORDINANCE FACTORY BOARD
- paternity leave
- pay fixation
- PCDA
- PENSION
- post offices
- POSTAL EMPLOYEES
- RAILWAY BOARD
- RAILWAY BONUS
- RAILWAY EMPLOYEES
- retirement
- retirement age
- revision of pension
- VRS
- WOMEN EMPLOYEES
Follow by Email
DISCLAIMER
The contents and information given in this blog are purely informative in nature and should not under any circumstances be taken as authority. All efforts had been made to ensure accuracy of the content on this (www.centralgovernmentemployees.com) blog. The same should not be construed as a statement of law or used for any legal purposes. centralgovernmentemployees.com accepts no responsibility in relation to the accuracy, completeness or otherwise, of the contents. Users are advised to verify/check any information with the relevant departments and to obtain any appropriate professional advice before acting on the information provided in the blog. We cannot guarantee the availability linked pages at all times.
Post a Comment